Portfolio Wave · Foray 210

From an outcome
to the work it needs.

Illustrative tunnel section connecting two shores beneath the Solway
Illustrative scene; the experiments below state their own assumptions.

Toy scenario

Imagine delivering a tunnel beneath the Solway.

A finished tunnel needs more than permanent lining: excavation, temporary access and support, installed systems, inspections and evidence all play different roles. Smaller installation examples let us test those distinctions without pretending to engineer the whole tunnel.

Can a description of the desired result explain the work needed to achieve it?

Solway is an experimental setting for semantic project planning. Can we explain the work a goal requires by distinguishing physical products, processes, temporary means and evidence?

Try the distinctions

The handover game

Choose the work needed to deliver an accepted installation. Discover why a finished product alone does not reveal all the work.

Play the game →
The handover game showing the shared gantry and two units awaiting installation
An example game state. Your choices change the work and its outcome.

The broader tunnel ontology remains available for exploration. The app collection includes separate investigations of temporal relations, local-to-global construction and ontology auditing.

These are synthetic experiments. Model checks establish results within declared assumptions; they do not establish an engineered tunnel design or practitioner validation.