Show / hide constraints
Key parameters
Canal buffer (m)
Road buffer (m)
Rail buffer (m)
OHL corridor half-width (m)
Mine influence radius (m)
Vertical stack (section)
Road deck height (m)
Rail deck height (m)
OHL conductor height (m)
Mine depth to crown (m)
Canal bed depth (m)
Read-out (distance from the site centre to assumed bands)
The figures rank up to four visible bands by distance from the triangle’s centre to the assumed band edge. A negative value means that centre lies inside the band. This is a geometric illustration, not a ranking of engineering risks or a buildable-area calculation.
In section, compare the assumed heights and depths. This drawing does not calculate which constraint governs a feasible design or select a foundation strategy.