Marking-to-plan: build, challenge and revise
12 September2026 · Experiment04 · higher-autonomy Gimmer
Agreed direction
The user adopted the forward-generative clarification: review a mechanism and use it to generate alternative compliant plans. Detailed procedural WAYS were adopted for this higher-autonomy lane only, with the highlighted source-document methods explicitly retained. The main investigation remains open and source-led.
Construction and independent challenge
- Recovered the original fourteen-source research register and read the relevant Petri, categorical planning, composition and scheduling methods. The public method note maps them to concrete features and limitations.
- Built the whole bounded state/step contract, all first-goal work branches, union of producer-count ancestries and explicit typed supply witnesses. Kept first-goal planning separate from possible continued work after a goal-covered state.
- Independently challenged tiny count systems, token allocation, resource timing, boundary identities, goal reachability and exact-versus-truncated search. The challenge found malformed timed-replay records throwing instead of returning a validation result; that path was repaired and retained as a regression.
- Built the ordinary browser journey. Early independent review found mismatched goal-gap rendering, a Unicode download/import size mismatch and inappropriate example framing for imported custom models; each was corrected before publication.
- In the canonical inherited app, gave the core forward scheduler and broader mechanism comparison distinct entry views over one maintained implementation. The inherited reference remains explicitly separate from higher-autonomy results.
Verification checkpoint
The integrated suite passes108 tests, including14 new focused tests and13 independent-oracle tests. The independent oracle exhausts2,376 small systems, checks every supplied scenario, token-supply quotients, fixed-witness timing, counted boundary/frame balance and11 computational cap types. The eight-independent-task boundary has256 reachable states,6,305 joint steps,40,320 first-goal traces and one deduplicated ancestry plan.
The new ordinary browser journey passes36 checks, including both delivery scopes, changed resource concurrency, mechanism-rule changes, invalid versus unreachable markings, partial budgets, typed wiring, work-tree failure, small/large timing, save/reopen/correct/download, Unicode, imported-claim rejection, cancellation and stale file/worker protection, keyboard use and390px layout. No uncaught exceptions were recorded; desktop and phone screenshots were inspected. The retained contract and causal journeys pass39 and29 checks respectively.
The canonical collection change is merged as PR60 at1d737c6; its Pages workflow34710354058 succeeded and all27 public browser checks pass. There remains one inherited app implementation.
This is the final prepublication source checkpoint for the new experiment. GitHub CI/Pages and exact served-source/public browser verification follow the push; final publication evidence is retained in the private foray receipt.
Evidence boundary
The construction is a finite method experiment with supplied scenarios and declared limits. Agent-operated model and interface verification is not engineering approval or independent human-use validation. Existing causal, ancestry-family and typed-composition experiments remain reachable. The earlier duplicate baseline stays withdrawn; no new recurring scheduler is created.